# Partition Management

The project manager can create multiple "zones" based on requirements and assign a manager for each zone. The purpose is to decompose the project structure, achieve partition management, and fulfill project needs.

# Project Sharing

Models, drawings and documents can be shared with different zones within the project scope. WeBIMSync will apply the latest version of each zone model set and drawings.

# Range Independent

The models, drawings, and role permissions of each zone are isolated from each other. The BIM manager can only upload the latest models and drawings belonging to their zone to the platform without affecting other zones.

# Permissions

Aside from project roles, each zone role needs to be assigned permission to work within the zone.